- Postcode districts
- M34, M43, OL6, OL7, SK14, SK16
- Nearby
- Dukinfield, Stalybridge and Droylsden
- Guide price
- £7,000–£14,000
- Typical time on site
- 8–15 working days
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a bathroom renovation cost in Ashton-under-Lyne?
Guide price in Ashton-under-Lyne: £7,000–£14,000 including VAT, depending on the room and what you choose. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Ashton-under-Lyne including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ashton-under-Lyne
We work right across Ashton-under-Lyne — M34, M43, OL6 and 3 more postcode districts — and in neighbouring Dukinfield and Stalybridge.
Homes in and around Ashton-under-Lyne vary, so we look at the floor, the walls and the water system before we price anything. If your Ashton-under-Lyne home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. Whether your Ashton-under-Lyne bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Supplies across most of Greater Manchester are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Repairs to rotten floorboards, joists or other timber found once the room is open
- New hot and cold pipework and wastes, with isolation valves to each fitting
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
Decisions to make first
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

