- Postcode districts
- SO14, SO15, SO16, SO17, SO18, SO19
- Nearby
- Hythe, Totton and Hedge End
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Southampton?
In Southampton, a bathroom renovation typically costs £8,400–£16,750 including VAT, based on South East England prices. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Southampton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Southampton
We work right across Southampton — SO14, SO15, SO16 and 3 more postcode districts — and in neighbouring Hythe and Totton.
Southampton is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. Whether your Southampton bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic. If you have just bought a house in Southampton, renovating the bathroom before moving in saves living through the dust.
Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
Decisions to make first
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
How far back to strip
Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

