Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Hampshire · SO30

Bathroom renovation in Hedge End

Need a bathroom renovation in Hedge End? We plan it around your room and your budget, then do the whole job with one team and one contract.

£8,400–£16,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Hedge End
Postcode districts
SO30
Nearby
Eastleigh, Southampton and Hythe
Guide price
£8,400–£16,750
Typical time on site
8–15 working days
Water
Hard across most of Hampshire
Survey
Free, at your home

What does a bathroom renovation cost in Hedge End?

In Hedge End, a bathroom renovation typically costs £8,400–£16,750 including VAT, based on South East England prices. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,600–£9,000
  • Make good and decorate

Structural

£13,500–£24,750
  • New drainage route

Guide prices for Hedge End including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Hedge End

In Hedge End we cover SO30; we also cover Eastleigh, 4.3 miles away, and Southampton.

Hedge End gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If you have just bought a house in Hedge End, renovating the bathroom before moving in saves living through the dust. If your Hedge End home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.

Most of Hampshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
  • Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas

Decisions to make first

Combining rooms

Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.

Pipe material

Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Hedge End: questions

How much should I budget for a bathroom renovation in Hedge End?

A bathroom renovation in Hedge End usually costs £8,400–£16,750 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

Do you cover SO30 in Hedge End?

Yes. We cover all of Hedge End, including SO30, and nearby Eastleigh, Southampton and Hythe. Survey visits are free and arranged at a time that suits you.

Is the water hard in Hedge End?

Most of Hampshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Hedge End?

Building control for Hedge End is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

Can I live in the house during a bathroom renovation?

Yes, most people do. Expect dust, noise and the water to be off for short spells, and plan for no bath or shower in that room for two to three weeks. If it is your only toilet, talk to us at the survey about keeping a WC working for as much of the job as possible.

Bathroom renovation in Hedge End

Book a free home survey in Hedge End. You get a measured layout and an itemised written price before anything is ordered.