- Postcode districts
- SO30
- Nearby
- Eastleigh, Southampton and Hythe
- Guide price
- £6,700–£13,500
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a wet room cost in Hedge End?
Guide price in Hedge End: £6,700–£13,500 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Hedge End including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hedge End
We work right across Hedge End — SO30 — and in neighbouring Eastleigh and Southampton.
Hedge End gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If you are planning a wet room in Hedge End for level access, we design the fall and drain so the floor is flush from the doorway. We quote wet rooms in Hedge End only after looking at the floor construction, because that is where most of the cost difference lies.
Supplies across most of Hampshire are hard. If your supply in Hedge End is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Strip-out, waste removal, a final flow test to the drain and handover
- Slip-resistant porcelain floor tiles and wall tiling
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Screen size
A screen of 1200 mm or more keeps spray off the rest of the room in most layouts. In a very small wet room, expect the whole floor to get wet.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

