- Postcode districts
- RG26
- Nearby
- Basingstoke, Thatcham and Newbury
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Tadley?
In Tadley, a bathroom renovation typically costs £8,400–£16,750 including VAT, based on South East England prices. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Tadley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tadley
As well as Tadley itself (RG26), we survey in Basingstoke, Thatcham and Newbury.
Being a smaller town does not change how we work in Tadley: free survey, written quote, one team. If your Tadley home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. If you have just bought a house in Tadley, renovating the bathroom before moving in saves living through the dust.
Most of Hampshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Repairs to rotten floorboards, joists or other timber found once the room is open
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
How far back to strip
Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

