- Postcode districts
- RG1, RG2, RG4, RG30, RG31
- Nearby
- Lower Earley, Wokingham and Crowthorne
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Berkshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Reading?
For Reading, our guide range for a bathroom renovation is £8,400 to £16,750 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Reading including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Reading
We work right across Reading — RG1, RG2, RG4 and 2 more postcode districts — and in neighbouring Lower Earley and Wokingham.
Reading is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. A renovation survey in Reading looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. For listed and period properties in Reading, we check early whether listed building consent applies to the work you have in mind.
Supplies across most of Berkshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Repairs to rotten floorboards, joists or other timber found once the room is open
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
Decisions to make first
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Heating
Moving the radiator, adding a heated towel rail or laying underfloor heating is simpler while the room is stripped.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

