- Postcode districts
- CT8, CT9, CT11
- Nearby
- Broadstairs, Ramsgate and Deal
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a bathroom renovation cost in Margate?
In Margate, a bathroom renovation typically costs £8,400–£16,750 including VAT, based on South East England prices. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Margate including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Margate
We cover every part of Margate, including CT8, CT9 and CT11, and nearby Broadstairs (2.9 miles) and Ramsgate (3.4 miles).
Homes in and around Margate vary, so we look at the floor, the walls and the water system before we price anything. In Margate flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. A renovation survey in Margate looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper.
Most of Kent has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

