- Postcode districts
- NG5, NG6, NG15
- Nearby
- Arnold, Eastwood and Kirkby in Ashfield
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Nottinghamshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Hucknall?
As a guide, budget £7,200 to £14,500 including VAT for a bathroom renovation in Hucknall; your written quote will pin it down. We adjust the national guide for East Midlands, where prices are typically about 4% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Hucknall including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hucknall
We cover every part of Hucknall, including NG5, NG6 and NG15, and nearby Arnold (3.6 miles) and Eastwood (4.8 miles).
Homes in and around Hucknall vary, so we look at the floor, the walls and the water system before we price anything. A renovation survey in Hucknall looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. For listed and period properties in Hucknall, we check early whether listed building consent applies to the work you have in mind.
Supplies across most of Nottinghamshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
Decisions to make first
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

