- Postcode districts
- DE7, NG10
- Nearby
- Eastwood, Heanor and Long Eaton
- Guide price
- £7,200–£14,500
- Typical time on site
- 8–15 working days
- Water
- Moderately hard across most of Derbyshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Ilkeston?
As a guide, budget £7,200 to £14,500 including VAT for a bathroom renovation in Ilkeston; your written quote will pin it down. Prices in East Midlands run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Same layout, new suite
Full renovation
- Re-plaster, new pipework and electrics
Structural
- Ventilation and lighting redesigned
Guide prices for Ilkeston including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ilkeston
As well as Ilkeston itself (DE7 and NG10), we survey in Eastwood, Heanor and Long Eaton.
Homes in and around Ilkeston vary, so we look at the floor, the walls and the water system before we price anything. A renovation survey in Ilkeston looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. Whether your Ilkeston bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Water across much of Derbyshire is moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Tiling, fitting of the suite and furniture, making good and decorating, then handover
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

