Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Warwickshire · CV8

Bathroom renovation in Kenilworth

Bathroom renovation in Kenilworth, planned from measurements taken in your home and priced in writing. We cover CV8 and the surrounding area.

£7,400–£14,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Kenilworth
Postcode districts
CV8
Nearby
Warwick, Coventry and Royal Leamington Spa
Guide price
£7,400–£14,750
Typical time on site
8–15 working days
Water
Hard across most of Warwickshire
Survey
Free, at your home

What does a bathroom renovation cost in Kenilworth?

Our guide price for a bathroom renovation in Kenilworth is £7,400–£14,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£4,900–£7,800
  • Re-tile and re-floor

Structural

£11,750–£21,500
  • Walls moved or rooms combined

Guide prices for Kenilworth including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Kenilworth

In Kenilworth we cover CV8; we also cover Warwick, 4.6 miles away, and Coventry.

Being a smaller town does not change how we work in Kenilworth: free survey, written quote, one team. For listed and period properties in Kenilworth, we check early whether listed building consent applies to the work you have in mind. Whether your Kenilworth bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.

Most of Warwickshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier

Decisions to make first

Shower floor

With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Kenilworth: questions

What is the price of a bathroom renovation in Kenilworth?

A bathroom renovation in Kenilworth usually costs £7,400–£14,750 including VAT. Where you land in that range depends on the size of the room, whether the layout changes and the products you choose. After the free survey you get an itemised written quote, and the price is fixed in writing once the layout and products are agreed.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Kenilworth.

Is the home survey in Kenilworth really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Do you cover CV8 in Kenilworth?

Yes. We cover all of Kenilworth, including CV8, and nearby Warwick, Coventry and Royal Leamington Spa. Survey visits are free and arranged at a time that suits you.

What is the difference between a bathroom refit and a renovation?

A refit replaces the visible parts, the suite, tiles and floor, and keeps the pipework, wiring and walls behind them. A renovation strips the room to its structure and replaces those hidden services too, often with a new layout. It costs more and takes longer, but it deals with problems a refit would only cover up.

Bathroom renovation in Kenilworth

Book a free home survey in Kenilworth. You get a measured layout and an itemised written price before anything is ordered.