- Postcode districts
- CV1, CV2, CV3, CV4, CV5, CV6
- Nearby
- Kenilworth, Bedworth and Nuneaton
- Guide price
- £7,400–£14,750
- Typical time on site
- 8–15 working days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a bathroom renovation cost in Coventry?
Guide price in Coventry: £7,400–£14,750 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Coventry including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Coventry
As well as Coventry itself (CV1, CV2, CV3 and 3 more postcode districts), we survey in Kenilworth, Bedworth and Nuneaton.
Coventry is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. For listed and period properties in Coventry, we check early whether listed building consent applies to the work you have in mind. In Coventry flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent.
Water hardness varies across the West Midlands: some supplies are soft, others moderately hard or hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- New hot and cold pipework and wastes, with isolation valves to each fitting
Decisions to make first
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
How far back to strip
Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

