- Postcode districts
- PL31
- Nearby
- St Austell, Newquay and Truro
- Guide price
- £45–£90 per m²
- Typical time on site
- 2–4 working days
- Water
- Soft across most of Cornwall
- Survey
- Free, at your home
What does bathroom tiling cost in Bodmin?
Our guide price for bathroom tiling in Bodmin is £45–£90 per m² including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Grout and trims
Porcelain
- Porcelain walls and floor
Large-format or stone
- Mitred edges, niches
Guide prices for Bodmin including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bodmin
As well as Bodmin itself (PL31), we survey in St Austell, Newquay and Truro.
Being a smaller town does not change how we work in Bodmin: free survey, written quote, one team. If you want a tiled shower floor in your Bodmin bathroom, the tanking and drainage are planned before the tile is chosen. Tiling quotes in Bodmin list the tile, the area and the preparation separately, so you can compare like for like.
Most of Cornwall is supplied with soft water. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Measuring wall and floor areas and working out quantities with an allowance for cuts
- Floor preparation: overlaying timber floors with ply or backer board, or levelling a screed
- Setting out so cuts are even and joints line up with niches, windows and edges
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
Decisions to make first
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Tile size
Large-format tiles mean fewer grout lines but need flat walls and more preparation. Small tiles and mosaics follow uneven surfaces and grip better underfoot.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

