- Postcode districts
- PL31
- Nearby
- St Austell, Newquay and Truro
- Guide price
- £350–£1,550
- Typical time on site
- half a day to 1 day
- Water
- Soft across most of Cornwall
- Survey
- Free, at your home
What does a new vanity unit cost in Bodmin?
Guide price in Bodmin: £350–£1,550 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Taps and waste connected
Supply and fit
- Removal of the old basin
Double or bespoke
- Double basin or long run
Guide prices for Bodmin including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Bodmin
In Bodmin we cover PL31; we also cover St Austell, 9.2 miles away, and Newquay.
Being a smaller town does not change how we work in Bodmin: free survey, written quote, one team. If your Bodmin water is hard, a tap with a removable aerator and a smooth one-piece basin top are easier to keep clean. Wall-hung vanities in Bodmin homes are fixed to suit what the wall is built from, which we check at the survey.
Water across much of Cornwall is soft. In soft water, taps, wastes and toilet pans scale up slowly, so brushed and matt finishes are a safe choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Testing for leaks and checking the trap holds its seal
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
- Patching or re-tiling the wall where the old basin left gaps
- Removal of the old basin and pedestal, or old vanity, and taking it away
Decisions to make first
Drawers or doors
Drawers keep things visible and reachable but lose some space to the trap. Doors give a deeper cupboard and cost less.
Wall-hung or floor-standing
Wall-hung units leave the floor clear and are easy to clean under, but need a strong wall. Floor-standing units hold more and suit weak or uneven walls.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

