- Postcode districts
- TR7
- Nearby
- Truro, St Austell and Redruth
- Guide price
- £350–£1,550
- Typical time on site
- half a day to 1 day
- Water
- Soft across most of Cornwall
- Survey
- Free, at your home
What does a new vanity unit cost in Newquay?
In Newquay, a new vanity unit typically costs £350–£1,550 including VAT, based on South West England prices. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Sealed and tested
Supply and fit
- Floor-standing or wall-hung unit
Double or bespoke
- Stone or solid-surface top
Guide prices for Newquay including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newquay
We work right across Newquay — TR7 — and in neighbouring Truro and St Austell.
Being a smaller town does not change how we work in Newquay: free survey, written quote, one team. If your Newquay cloakroom still has a pedestal basin, a compact vanity unit adds storage without taking more floor. Wall-hung vanities in Newquay homes are fixed to suit what the wall is built from, which we check at the survey.
Most of Cornwall is supplied with soft water. In soft water, taps, wastes and toilet pans scale up slowly, so brushed and matt finishes are a safe choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Moving the waste and supply positions where the new unit needs them higher, lower or to one side
- Testing for leaks and checking the trap holds its seal
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
- A new tap, trap and the correct slotted or unslotted waste for the basin
Decisions to make first
One basin or two
Two basins help a busy household if the wall is long enough. In a smaller room, one basin with a longer top often works better.
Basin type
An inset or semi-recessed basin, a one-piece moulded top, or a countertop basin on a worktop. Countertop basins need a tall tap or a wall-mounted one.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

