- Postcode districts
- BH25
- Nearby
- Christchurch, Bournemouth and Ferndown
- Guide price
- £2,000–£5,000
- Typical time on site
- 2–4 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a cloakroom or downstairs WC cost in New Milton?
For New Milton, our guide range for a cloakroom or downstairs WC is £2,000 to £5,000 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Compact WC and corner or wall basin
Upgrade
- Feature tiles and lighting
New cloakroom
- Formed under the stairs or in a utility
Guide prices for New Milton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in New Milton
In New Milton we cover BH25; we also cover Christchurch, 5.2 miles away, and Bournemouth.
In New Milton, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. For a new cloakroom in New Milton, the first thing we look at is where the nearest drain or soil stack runs. Where your New Milton home already has a WC on gravity drainage, a macerator opens up more places a new cloakroom can go.
Supplies across most of Hampshire are hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- An extractor fan ducted to outside, wired with an overrun timer or linked to the light
- A new waste connection to the soil stack or drain, or a macerator where the rules allow it
- Strip-out of the old fittings, waste removal and making good on the hall side
- Lighting wired by a qualified electrician, tested and certified
Decisions to make first
Under-stair layout
Headroom drops quickly under stairs. The basin and the space in front of the WC need standing height; the low end of the room can take the cistern or storage.
Door
An outward-opening door is usually needed so it does not hit the WC. A sliding door suits a narrow hallway where an outward door would block the way.
Rules that apply in England
In England, a new WC connected to the soil stack or drain is drainage work under Part H, and a newly formed cloakroom without an opening window should have mechanical extract; Approved Document F gives 6 litres per second as the design rate for a WC, against 15 for a bathroom. Because a cloakroom has no bath or shower, adding a light to an existing circuit is not notifiable under Part P, but a new circuit is.

