Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Hampshire · BH25

Bathroom renovation in New Milton

Thinking about a bathroom renovation in New Milton? Here is what it usually costs locally, what the work involves and how we go about it.

£8,400–£16,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for New Milton
Postcode districts
BH25
Nearby
Christchurch, Bournemouth and Ferndown
Guide price
£8,400–£16,750
Typical time on site
8–15 working days
Water
Hard across most of Hampshire
Survey
Free, at your home

What does a bathroom renovation cost in New Milton?

Guide price in New Milton: £8,400–£16,750 including VAT, depending on the room and what you choose. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,600–£9,000
  • Re-tile and re-floor

Structural

£13,500–£24,750
  • Walls moved or rooms combined

Guide prices for New Milton including VAT. Your itemised written quote after the free survey is the price that counts.

Working in New Milton

We work right across New Milton — BH25 — and in neighbouring Christchurch and Bournemouth.

In New Milton, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. In New Milton flats, the lease and the flat below are considered before a renovation is planned, particularly for moving the WC or adding a vent. If your New Milton home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.

Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover
  • Repairs to rotten floorboards, joists or other timber found once the room is open

Decisions to make first

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Pipe material

Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in New Milton: questions

How much should I budget for a bathroom renovation in New Milton?

A bathroom renovation in New Milton usually costs £8,400–£16,750 including VAT. Room size, layout changes and your choice of products move the figure within that range. The free survey gives you an itemised quote, fixed in writing once the details are agreed.

Who handles building control for a bathroom renovation in New Milton?

Building control for New Milton is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in New Milton.

Is the home survey in New Milton really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Can I live in the house during a bathroom renovation?

Yes, most people do. Expect dust, noise and the water to be off for short spells, and plan for no bath or shower in that room for two to three weeks. If it is your only toilet, talk to us at the survey about keeping a WC working for as much of the job as possible.

Bathroom renovation in New Milton

Book a free home survey in New Milton. You get a measured layout and an itemised written price before anything is ordered.