Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Dorset · BH6

Bathroom renovation in Christchurch

If you are planning a bathroom renovation in Christchurch, the first step is a free survey visit: we measure, check your pipework and electrics, and give you a written quote.

£7,600–£15,250 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Christchurch
Postcode districts
BH6, BH7, BH23
Nearby
Bournemouth, New Milton and Ferndown
Guide price
£7,600–£15,250
Typical time on site
8–15 working days
Water
Hard across most of Dorset
Survey
Free, at your home

What does a bathroom renovation cost in Christchurch?

In Christchurch, a bathroom renovation typically costs £7,600–£15,250 including VAT, based on South West England prices. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,100–£8,200
  • Re-tile and re-floor

Structural

£12,250–£22,500
  • Walls moved or rooms combined

Guide prices for Christchurch including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Christchurch

We cover every part of Christchurch, including BH6, BH7 and BH23, and nearby Bournemouth (4.4 miles) and New Milton (5.2 miles).

Homes in and around Christchurch vary, so we look at the floor, the walls and the water system before we price anything. For listed and period properties in Christchurch, we check early whether listed building consent applies to the work you have in mind. If your Christchurch home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.

Most of Dorset has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
  • Tiling, fitting of the suite and furniture, making good and decorating, then handover
  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
  • New hot and cold pipework and wastes, with isolation valves to each fitting

Decisions to make first

Plaster or boards

Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.

Combining rooms

Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Christchurch: questions

What is the price of a bathroom renovation in Christchurch?

A bathroom renovation in Christchurch usually costs £7,600–£15,250 including VAT. Room size, layout changes and your choice of products move the figure within that range. The free survey gives you an itemised quote, fixed in writing once the details are agreed.

Is the home survey in Christchurch really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Do you cover BH6 in Christchurch?

Yes. We cover all of Christchurch, including BH6, BH7 and BH23, and nearby Bournemouth, New Milton and Ferndown. Survey visits are free and arranged at a time that suits you.

Is the water hard in Christchurch?

Most of Dorset has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What problems are found when a bathroom is stripped out?

The usual ones are rotten floorboards or joists around the WC and bath, old lead or corroded pipework, joists notched too deeply for pipes, plaster that has come away from the wall and circuits without RCD protection. In homes built before 2000, asbestos can turn up in textured ceiling coatings, old floor tiles, cistern lids or boxing panels.

Bathroom renovation in Christchurch

Book a free home survey in Christchurch. You get a measured layout and an itemised written price before anything is ordered.