What does a cloakroom or downstairs WC cost in Redhill?
Guide price in Redhill: £2,000–£5,000 including VAT, depending on the room and what you choose. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing downstairs WC
Upgrade
- Vanity basin with storage
New cloakroom
- Extractor fan to regulations
Guide prices for Redhill including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Redhill
As well as Redhill itself (RH1 and RH2), we survey in Reigate, Horley and Caterham.
Homes in and around Redhill vary, so we look at the floor, the walls and the water system before we price anything. If you are refreshing a dated cloakroom in Redhill, a wall-hung WC and slim vanity can change the room in a few days. Where your Redhill home already has a WC on gravity drainage, a macerator opens up more places a new cloakroom can go.
Supplies across most of Surrey are hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey that checks the headroom under the stairs, the door swing and how the waste will reach the drain
- Splashback or feature tiling and a new floor, often LVT or porcelain
- Compact sanitaryware: a short-projection, back-to-wall or wall-hung WC and a corner, wall-hung or slim vanity basin
- Strip-out of the old fittings, waste removal and making good on the hall side
Decisions to make first
Basin
A corner basin fits the tightest rooms. A slim vanity basin with a cupboard underneath gives somewhere to keep spare toilet rolls and soap, and hides the trap.
Door
An outward-opening door is usually needed so it does not hit the WC. A sliding door suits a narrow hallway where an outward door would block the way.
Rules that apply in England
In England, a new WC connected to the soil stack or drain is drainage work under Part H, and a newly formed cloakroom without an opening window should have mechanical extract; Approved Document F gives 6 litres per second as the design rate for a WC, against 15 for a bathroom. Because a cloakroom has no bath or shower, adding a light to an existing circuit is not notifiable under Part P, but a new circuit is.