What does an en-suite cost in County Fermanagh?
Our guide range in County Fermanagh is £4,000–£7,900 including VAT. Prices in County Fermanagh run at about 12% below the UK guide, based on Northern Ireland labour rates.
Refit
- Existing en-suite, same layout
Upgrade
- Fitted furniture with storage
New en-suite
- Ventilation and electrics to regulations
Guide prices for County Fermanagh including VAT. Your itemised written quote after the free survey is the price that counts.
Which towns do we cover in County Fermanagh?
Water across much of County Fermanagh is soft. If that holds for your street in Enniskillen, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier. If your Enniskillen en-suite fan just blows into the loft, we can duct it properly to outside as part of the refit.
What the job includes
- A short-projection or wall-hung WC and a compact basin chosen to keep the floor clear
- A shower tray or level-access former, an enclosure or walk-in panel, and a thermostatic valve
- A pumped waste or macerator where gravity drainage is not possible, and only where the house already has a WC on gravity drainage
- An extractor fan ducted to outside, sized to the room and wired with an overrun timer or humidistat
- Stud walls with acoustic insulation and moisture-resistant board for a new en-suite
- Tiling, silicone, testing and making good on the bedroom side of any new walls
Decisions to make first
Night lighting
A mirror light or low-level LED strip on its own switch lets you use the en-suite at night without the full glare of the ceiling lights.
Door type
An outward-opening door frees floor space inside. A sliding pocket door saves space on both sides but needs a stud wall long enough to take the cassette.
Noise
Acoustic insulation in the stud walls and a quiet fan make a real difference when one of you showers early while the other is still asleep.
Refit or new en-suite
A refit keeps the existing drainage and walls. A new en-suite costs more because the walls, waste route, fan duct and electrics all start from nothing.
Rules that apply in Northern Ireland
Forming an en-suite inside an existing bedroom does not normally need planning permission, but it is usually building-regulations work because it adds drainage, ventilation and electrics. All wiring must meet BS 7671, with 30 mA RCD protection on every circuit in the room. A macerator or pumped WC is acceptable only where the home also has a WC on gravity drainage. In a listed building, a new soil or vent pipe through a wall needs listed building consent.
In Northern Ireland, building control covers the new drainage and ventilation for an en-suite, with ventilation set out in Technical Booklet K. There is no Part P, but the wiring should still be designed, tested and certified to BS 7671.

