- Postcode districts
- TS18, TS19, TS20
- Nearby
- Billingham, Thornaby-on-Tees and Middlesbrough
- Guide price
- £5,800–£10,750
- Typical time on site
- 6–10 working days
- Water
- Moderately hard across most of County Durham
- Survey
- Free, at your home
What does a fitted bathroom cost in Stockton-on-Tees?
In Stockton-on-Tees, a fitted bathroom typically costs £5,800–£10,750 including VAT, based on North East England prices. We adjust the national guide for North East England, where prices are typically about 10% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Essential
- Like-for-like layout
Signature
- Thermostatic shower and glass screen
Bespoke
- Full-height tiling, underfloor heating
Guide prices for Stockton-on-Tees including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Stockton-on-Tees
We cover every part of Stockton-on-Tees, including TS18, TS19 and TS20, and nearby Billingham (1.8 miles) and Thornaby-on-Tees (2.5 miles).
Across a large town like Stockton-on-Tees, homes range from older terraces to newer estates; the survey tells us which pipework and floor we are dealing with. Fitted furniture suits the many Stockton-on-Tees bathrooms that have to hold towels, toiletries and cleaning things for a whole household. If your Stockton-on-Tees bathroom has pipes boxed in at odd angles, a fitted run is often the neatest way to hide them for good.
Supplies across most of County Durham are moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- First and second-fix plumbing, including concealed cistern frames and new isolation valves
- Layout options drawn to your room, including where the furniture run, bath or shower and towel rail will go
- Strip-out of the old bathroom and removal of the waste
- Electrical work by a qualified electrician: lighting, extractor fan, shaver socket or heating, tested and certified
Decisions to make first
Furniture finish
Matt or gloss lacquer, wood-effect, painted shaker or handleless. Darker finishes hide marks; lighter ones make a small room feel bigger.
Heating
A heated towel rail is standard. Electric underfloor heating under the tiles makes the room comfortable and dries the floor quickly.
Rules that apply in England
In England, new circuits and most electrical changes in a bathroom are notifiable under Part P, so they must be done by an electrician registered with a competent person scheme or notified to building control. If you are adding a new extractor fan, Approved Document F gives 15 litres per second as the usual intermittent extract rate.

