- Postcode districts
- EX16
- Nearby
- Exeter, Taunton and Exmouth
- Guide price
- £6,600–£13,250
- Typical time on site
- 6–12 working days
- Water
- Soft across most of Devon
- Survey
- Free, at your home
What does a loft bathroom cost in Tiverton?
For Tiverton, our guide range for a loft bathroom is £6,600 to £13,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Shower, basin and WC replaced
Signature
- Pump or macerator where needed
New loft bathroom
- Formed in an existing loft room
Guide prices for Tiverton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tiverton
We work right across Tiverton — EX16 — and in neighbouring Exeter and Taunton.
Tiverton gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Tiverton loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have. We plan loft bathrooms in Tiverton around the roof line, so the shower sits where you can stand and the eaves become storage.
Supplies across most of Devon are soft. If that holds for your street in Tiverton, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A survey of the headroom across the room, with the usable height marked at each fitting position
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A check of the floor joists where a bath or large shower tray will sit
Decisions to make first
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Roof window
A roof window over the bath or shower brings daylight and fresh air, but plan the blind for privacy and expect condensation on cold glass.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

