- Postcode districts
- IG11, RM6, RM8, RM9, RM10
- Nearby
- Ilford, Becontree and Dagenham
- Guide price
- £8,100–£16,250
- Typical time on site
- 6–12 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a loft bathroom cost in Barking?
Guide price in Barking: £8,100–£16,250 including VAT, depending on the room and what you choose. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Barking including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Barking
As well as Barking itself (IG11, RM6, RM8 and 2 more postcode districts), we survey in Ilford, Becontree and Dagenham.
London homes in Barking often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Barking loft shower is weak or the waste drains slowly, the fix is often in the pump or the pipe fall rather than the shower itself. If your Barking loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have.
Most of Greater London has very hard water. If your supply in Barking is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- A survey of the headroom across the room, with the usable height marked at each fitting position
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
Decisions to make first
Roof window
A roof window over the bath or shower brings daylight and fresh air, but plan the blind for privacy and expect condensation on cold glass.
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

