- Postcode districts
- N7, N19, NW5
- Nearby
- Highbury, Archway and Camden Town
- Guide price
- £8,100–£16,250
- Typical time on site
- 6–12 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a loft bathroom cost in Holloway?
As a guide, budget £8,100 to £16,250 including VAT for a loft bathroom in Holloway; your written quote will pin it down. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing loft shower room
Signature
- Fitted furniture to the eaves
New loft bathroom
- Ventilation and electrics to regulations
Guide prices for Holloway including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Holloway
We cover every part of Holloway, including N7, N19 and NW5, and nearby Highbury (1.1 miles) and Archway (1.1 miles).
London homes in Holloway often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Holloway house has a combi boiler, a loft shower can usually run on mains pressure without a pump. If your Holloway loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have.
Water across much of Greater London is very hard. If your supply in Holloway is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A survey of the headroom across the room, with the usable height marked at each fitting position
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
Decisions to make first
Getting the water pressure
A pumped shower suits a gravity system with a cold tank; an electric shower heats cold mains water at the point of use; a combi or unvented cylinder gives mains pressure throughout.
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

