What does a loft bathroom cost in Wembley?
As a guide, budget £8,100 to £16,250 including VAT for a loft bathroom in Wembley; your written quote will pin it down. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Shower, basin and WC replaced
Signature
- Pump or macerator where needed
New loft bathroom
- Formed in an existing loft room
Guide prices for Wembley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wembley
We cover every part of Wembley, including HA0, HA9 and UB6, and nearby Brent (0.2 miles) and Harrow (2.3 miles).
London homes in Wembley often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Wembley loft shower is weak or the waste drains slowly, the fix is often in the pump or the pipe fall rather than the shower itself. For a loft bathroom in a tank-fed Wembley home, we work out how the shower will get its pressure before choosing a single fitting.
Water across much of Greater London is very hard. If your supply in Wembley is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the headroom across the room, with the usable height marked at each fitting position
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A check of the floor joists where a bath or large shower tray will sit
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
Decisions to make first
Roof window
A roof window over the bath or shower brings daylight and fresh air, but plan the blind for privacy and expect condensation on cold glass.
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.