- Postcode districts
- N8, N10, N22
- Nearby
- Muswell Hill, Tottenham and Archway
- Guide price
- £8,100–£16,250
- Typical time on site
- 6–12 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a loft bathroom cost in Wood Green?
Our guide price for a loft bathroom in Wood Green is £8,100–£16,250 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Wood Green including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wood Green
As well as Wood Green itself (N8, N10 and N22), we survey in Muswell Hill, Tottenham and Archway.
In Wood Green, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. For a loft bathroom in a tank-fed Wood Green home, we work out how the shower will get its pressure before choosing a single fitting. If your Wood Green house has a combi boiler, a loft shower can usually run on mains pressure without a pump.
Supplies across most of Greater London are very hard. If your supply in Wood Green is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of the floor joists where a bath or large shower tray will sit
- A survey of the headroom across the room, with the usable height marked at each fitting position
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
Decisions to make first
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Roof window
A roof window over the bath or shower brings daylight and fresh air, but plan the blind for privacy and expect condensation on cold glass.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

