- Postcode districts
- N8, N10, N22
- Nearby
- Muswell Hill, Tottenham and Archway
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Wood Green?
Design comes with the job: the survey, layout and itemised quote are free. In Wood Green, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Wood Green including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Wood Green
We work right across Wood Green — N8, N10 and N22 — and in neighbouring Muswell Hill and Tottenham.
London homes in Wood Green often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If you are in Wood Green and weighing a bath against a walk-in shower, the layout options show both with their prices. If your Wood Green bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

