- Postcode districts
- N9, N18, N21
- Nearby
- Tottenham, Enfield and Chingford
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a new bathroom design cost in Edmonton?
Design comes with the job: the survey, layout and itemised quote are free. In Edmonton, a complete designed, supplied and fitted bathroom typically costs £8,100–£15,000 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Edmonton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Edmonton
In Edmonton we cover N9, N18 and N21; we also cover Tottenham, 1.6 miles away, and Enfield.
London homes in Edmonton often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Edmonton bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. Whether you are in Edmonton or elsewhere in Greater London, layout options come with an itemised written quote.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A conversation about who uses the room, when, and what does not work about the current one
- A clear view of which changes are cheap and which mean moving drainage or opening floors
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

