- Postcode districts
- M34, SK14, SK16
- Nearby
- Denton, Dukinfield and Stalybridge
- Guide price
- £6,100–£12,250
- Typical time on site
- 6–12 working days
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a loft bathroom cost in Hyde?
In Hyde, a loft bathroom typically costs £6,100–£12,250 including VAT, based on North West England prices. Labour costs in North West England put local prices at about 6% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing loft shower room
Signature
- Fitted furniture to the eaves
New loft bathroom
- Ventilation and electrics to regulations
Guide prices for Hyde including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hyde
In Hyde we cover M34, SK14 and SK16; we also cover Denton, 1.6 miles away, and Dukinfield.
Homes in and around Hyde vary, so we look at the floor, the walls and the water system before we price anything. If your Hyde loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have. We plan loft bathrooms in Hyde around the roof line, so the shower sits where you can stand and the eaves become storage.
Most of Greater Manchester is supplied with soft water. If that holds for your street in Hyde, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- A check of your hot-water system and of the pressure and flow you actually get at loft level
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
Decisions to make first
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.