- Postcode districts
- M34, SK5, SK16
- Nearby
- Hyde, Dukinfield and Droylsden
- Guide price
- £6,100–£12,250
- Typical time on site
- 6–12 working days
- Water
- Soft across most of Greater Manchester
- Survey
- Free, at your home
What does a loft bathroom cost in Denton?
In Denton, a loft bathroom typically costs £6,100–£12,250 including VAT, based on North West England prices. Prices in North West England run at about 6% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Denton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Denton
In Denton we cover M34, SK5 and SK16; we also cover Hyde, 1.6 miles away, and Dukinfield.
In Denton, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If your Denton loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have. For a loft bathroom in a tank-fed Denton home, we work out how the shower will get its pressure before choosing a single fitting.
Water across much of Greater Manchester is soft. If that holds for your street in Denton, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
Decisions to make first
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

