- Postcode districts
- HR6
- Nearby
- Hereford, Ledbury and Great Malvern
- Guide price
- £6,400–£12,750
- Typical time on site
- 6–12 working days
- Water
- Moderately hard across most of Herefordshire
- Survey
- Free, at your home
What does a loft bathroom cost in Leominster?
For Leominster, our guide range for a loft bathroom is £6,400 to £12,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing loft shower room
Signature
- Fitted furniture to the eaves
New loft bathroom
- Ventilation and electrics to regulations
Guide prices for Leominster including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Leominster
We cover every part of Leominster, including HR6, and nearby Hereford (11.7 miles) and Ledbury (18.8 miles).
Being a smaller town does not change how we work in Leominster: free survey, written quote, one team. If your Leominster loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have. We plan loft bathrooms in Leominster around the roof line, so the shower sits where you can stand and the eaves become storage.
Supplies across most of Herefordshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Leominster. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A check of your hot-water system and of the pressure and flow you actually get at loft level
Decisions to make first
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Roof window
A roof window over the bath or shower brings daylight and fresh air, but plan the blind for privacy and expect condensation on cold glass.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

