- Postcode districts
- YO1, YO10, YO24, YO31
- Nearby
- Selby, Kippax and Harrogate
- Guide price
- £6,000–£12,000
- Typical time on site
- 6–12 working days
- Water
- Moderately hard across most of North Yorkshire
- Survey
- Free, at your home
What does a loft bathroom cost in York?
Guide price in York: £6,000–£12,000 including VAT, depending on the room and what you choose. Labour costs in Yorkshire and the Humber put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for York including VAT. Your itemised written quote after the free survey is the price that counts.
Working in York
We work right across York — YO1, YO10, YO24 and 1 more postcode districts — and in neighbouring Selby and Kippax.
York is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. If your York house has a combi boiler, a loft shower can usually run on mains pressure without a pump. If your York loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have.
Most of North Yorkshire has moderately hard water. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in York. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of your hot-water system and of the pressure and flow you actually get at loft level
- A check of the floor joists where a bath or large shower tray will sit
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
Decisions to make first
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Roof window
A roof window over the bath or shower brings daylight and fresh air, but plan the blind for privacy and expect condensation on cold glass.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

