- Postcode districts
- PO9, PO10
- Nearby
- Havant, South Hayling and Hayling Island
- Guide price
- £7,300–£14,500
- Typical time on site
- 6–12 working days
- Water
- Hard across most of West Sussex
- Survey
- Free, at your home
What does a loft bathroom cost in Emsworth?
Guide price in Emsworth: £7,300–£14,500 including VAT, depending on the room and what you choose. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing loft shower room
Signature
- Fitted furniture to the eaves
New loft bathroom
- Ventilation and electrics to regulations
Guide prices for Emsworth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Emsworth
In Emsworth we cover PO9 and PO10; we also cover Havant, 2.2 miles away, and South Hayling.
Being a smaller town does not change how we work in Emsworth: free survey, written quote, one team. If your Emsworth loft conversion has a bedroom but no bathroom, the survey starts with where the soil stack runs and how much headroom you have. If your Emsworth home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options.
Supplies across most of West Sussex are hard. If your supply in Emsworth is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of the floor joists where a bath or large shower tray will sit
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- A check of your hot-water system and of the pressure and flow you actually get at loft level
Decisions to make first
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

