- Postcode districts
- BD4, LS13, LS28
- Nearby
- Horsforth, Bradford and Morley
- Guide price
- £6,000–£12,000
- Typical time on site
- 6–12 working days
- Water
- Soft across most of West Yorkshire
- Survey
- Free, at your home
What does a loft bathroom cost in Pudsey?
Our guide price for a loft bathroom in Pudsey is £6,000–£12,000 including VAT. We adjust the national guide for Yorkshire and the Humber, where prices are typically about 7% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Tiling, lighting, extractor fan
Signature
- Walk-in shower under the ridge
New loft bathroom
- New drainage route and water supply
Guide prices for Pudsey including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Pudsey
We work right across Pudsey — BD4, LS13 and LS28 — and in neighbouring Horsforth and Bradford.
Homes in and around Pudsey vary, so we look at the floor, the walls and the water system before we price anything. If your Pudsey home has a gravity-drained WC on another floor, a macerator in the loft may open up more layout options. We plan loft bathrooms in Pudsey around the roof line, so the shower sits where you can stand and the eaves become storage.
Water across much of West Yorkshire is soft. If that holds for your street in Pudsey, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Fitted furniture made to the eaves, so the low space behind the slope becomes storage
- A survey of the headroom across the room, with the usable height marked at each fitting position
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A drainage route from the loft to the soil stack with enough fall, or a pumped waste or macerator where the rules allow it
Decisions to make first
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Eaves storage
Low cupboards built into the slope behind the WC or basin take clutter out of the room and hide the pipework.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

