- Postcode districts
- LS18, LS19, LS20
- Nearby
- Guiseley, Horsforth and Shipley
- Guide price
- £6,000–£12,000
- Typical time on site
- 6–12 working days
- Water
- Soft across most of West Yorkshire
- Survey
- Free, at your home
What does a loft bathroom cost in Yeadon?
In Yeadon, a loft bathroom typically costs £6,000–£12,000 including VAT, based on Yorkshire and the Humber prices. Prices in Yorkshire and the Humber run at about 7% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refit
- Existing loft shower room
Signature
- Fitted furniture to the eaves
New loft bathroom
- Ventilation and electrics to regulations
Guide prices for Yeadon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Yeadon
In Yeadon we cover LS18, LS19 and LS20; we also cover Guiseley, 1.3 miles away, and Horsforth.
In Yeadon, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We plan loft bathrooms in Yeadon around the roof line, so the shower sits where you can stand and the eaves become storage. If your Yeadon house has a combi boiler, a loft shower can usually run on mains pressure without a pump.
Water across much of West Yorkshire is soft. If that holds for your street in Yeadon, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Electrics by a qualified electrician, tested and certified, then tiling, testing and handover
- A shower pump on a gravity system, an electric shower, or advice on moving to mains pressure, depending on your system
- An extractor fan ducted through the roof or a gable wall, with the duct insulated through cold spaces
- A check of the floor joists where a bath or large shower tray will sit
Decisions to make first
Bath or no bath
A bath under the slope makes good use of low space, but the floor has to carry it when it is full of water and someone is in it.
Where the shower goes
Under the ridge or in a dormer, where the full height is. A walk-in shower with a single panel is usually easier to fit to a roof line than a framed enclosure.
Rules that apply in England
In England, new drainage and a new connection to the soil stack fall under Part H, a new bathroom needs extract of 15 litres per second intermittent or 8 litres per second continuous under Approved Document F, and new circuits are notifiable under Part P. If the work includes an unvented hot-water cylinder, it must be fitted by a G3-qualified installer.

