- Postcode districts
- LS18, LS19, LS20
- Nearby
- Guiseley, Horsforth and Shipley
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of West Yorkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Yeadon?
Design comes with the job: the survey, layout and itemised quote are free. In Yeadon, a complete designed, supplied and fitted bathroom typically costs £6,000–£11,250 including VAT. Prices in Yorkshire and the Humber run at about 7% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Yeadon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Yeadon
We cover every part of Yeadon, including LS18, LS19 and LS20, and nearby Guiseley (1.3 miles) and Horsforth (2.5 miles).
In Yeadon, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We measure Yeadon bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. Whether you are in Yeadon or elsewhere in West Yorkshire, layout options come with an itemised written quote.
Most of West Yorkshire is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A conversation about who uses the room, when, and what does not work about the current one
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

