- Postcode districts
- LS16, LS18, LS19
- Nearby
- Yeadon, Pudsey and Guiseley
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of West Yorkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Horsforth?
Design comes with the job: the survey, layout and itemised quote are free. In Horsforth, a complete designed, supplied and fitted bathroom typically costs £6,000–£11,250 including VAT. Labour costs in Yorkshire and the Humber put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Horsforth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Horsforth
We cover every part of Horsforth, including LS16, LS18 and LS19, and nearby Yeadon (2.5 miles) and Pudsey (3.4 miles).
Being a smaller town does not change how we work in Horsforth: free survey, written quote, one team. If you are in Horsforth and weighing a bath against a walk-in shower, the layout options show both with their prices. We measure Horsforth bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Most of West Yorkshire is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

