- Postcode districts
- PO14, PO15, PO16
- Nearby
- Gosport, Portsmouth and Southsea
- Guide price
- £500–£3,900
- Typical time on site
- half a day to 3 days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a new shower cost in Fareham?
Our guide price for a new shower in Fareham is £500–£3,900 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Fareham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Fareham
We cover every part of Fareham, including PO14, PO15 and PO16, and nearby Gosport (4.5 miles) and Portsmouth (5.3 miles).
In Fareham, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are replacing a failed electric shower in Fareham, we check whether the existing cable and circuit suit the new unit. If your Fareham bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.
Water across much of Hampshire is hard. If your supply in Fareham is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
- A bath screen, tray or enclosure where the shower is new
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- Electrical connection by a qualified electrician, tested and certified
Decisions to make first
Thermostatic mixer
Blends hot and cold from your system and holds the temperature steady when someone runs a tap. The usual choice with a combi or an unvented cylinder.
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

