- Postcode districts
- HR1, HR4
- Nearby
- Ross on Wye, Leominster and Ledbury
- Guide price
- £450–£3,400
- Typical time on site
- half a day to 3 days
- Water
- Moderately hard across most of Herefordshire
- Survey
- Free, at your home
What does a new shower cost in Hereford?
For Hereford, our guide range for a new shower is £450 to £3,400 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Hereford including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hereford
As well as Hereford itself (HR1 and HR4), we survey in Ross on Wye, Leominster and Ledbury.
In a city the size of Hereford, parking and access for a skip are worth sorting before the start date — we will ask at the survey. We test pressure and flow at Hereford surveys before recommending a shower, so you know how it will perform before you buy. If you want a shower in your Hereford home that works when the boiler is off, an electric shower is worth considering, as long as the consumer unit can take the circuit.
Supplies across most of Herefordshire are moderately hard. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Hereford. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- A check of your hot-water system, water pressure and flow rate
- A bath screen, tray or enclosure where the shower is new
- Electrical connection by a qualified electrician, tested and certified
Decisions to make first
Power shower
A mixer with a built-in pump, for tank-fed systems only. It lifts a weak gravity shower but must never be connected to the mains.
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

