- Postcode districts
- ME14, ME15, ME16
- Nearby
- Chatham, Rochester and Gillingham
- Guide price
- £500–£3,900
- Typical time on site
- half a day to 3 days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new shower cost in Maidstone?
Guide price in Maidstone: £500–£3,900 including VAT, depending on the room and what you choose. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Maidstone including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Maidstone
In Maidstone we cover ME14, ME15 and ME16; we also cover Chatham, 7.8 miles away, and Rochester.
Maidstone has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. If the shower in your Maidstone home swings between hot and cold, a thermostatic valve is usually the fix. We test pressure and flow at Maidstone surveys before recommending a shower, so you know how it will perform before you buy.
Supplies across most of Kent are very hard. If your supply in Maidstone is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- Electrical connection by a qualified electrician, tested and certified
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
Decisions to make first
Power shower
A mixer with a built-in pump, for tank-fed systems only. It lifts a weak gravity shower but must never be connected to the mains.
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

