- Postcode districts
- FY1, FY2, FY3, FY4
- Nearby
- Poulton-le-Fylde, Thornton-Cleveleys and Lytham St Annes
- Guide price
- £400–£3,300
- Typical time on site
- half a day to 3 days
- Water
- Soft across most of Lancashire
- Survey
- Free, at your home
What does a new shower cost in Blackpool?
Guide price in Blackpool: £400–£3,300 including VAT, depending on the room and what you choose. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Existing supply and position
New shower over bath
- Tiling the bath surround
New shower with enclosure
- Tray, enclosure and valve
Guide prices for Blackpool including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Blackpool
As well as Blackpool itself (FY1, FY2, FY3 and 1 more postcode districts), we survey in Poulton-le-Fylde, Thornton-Cleveleys and Lytham St Annes.
Blackpool has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. For Blackpool homes with a cold tank in the loft, we check the system before fitting anything, because a pump is only allowed on a gravity supply. If you are replacing a failed electric shower in Blackpool, we check whether the existing cable and circuit suit the new unit.
Water across much of Lancashire is soft. If that holds for your street in Blackpool, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of your hot-water system, water pressure and flow rate
- A bath screen, tray or enclosure where the shower is new
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
Decisions to make first
Power shower
A mixer with a built-in pump, for tank-fed systems only. It lifts a weak gravity shower but must never be connected to the mains.
Thermostatic mixer
Blends hot and cold from your system and holds the temperature steady when someone runs a tap. The usual choice with a combi or an unvented cylinder.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

