- Postcode districts
- TD1
- Nearby
- Hawick, Kelso and Peebles
- Guide price
- £450–£3,400
- Typical time on site
- half a day to 3 days
- Water
- Soft across most of the Scottish Borders
- Survey
- Free, at your home
What does a new shower cost in Galashiels?
Our guide price for a new shower in Galashiels is £450–£3,400 including VAT. We adjust the national guide for Scotland, where prices are typically about 4% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Galashiels including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Galashiels
We work right across Galashiels — TD1 — and in neighbouring Hawick and Kelso.
Galashiels gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If you are replacing a failed electric shower in Galashiels, we check whether the existing cable and circuit suit the new unit. If your Galashiels bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.
Most of the Scottish Borders is supplied with soft water. If that holds for your street in Galashiels, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Supply and fitting of the shower valve or unit, riser rail, handset or fixed head
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
- A check of your hot-water system, water pressure and flow rate
Decisions to make first
Head and handset
A handset on a riser rail is versatile and easy for rinsing; a fixed overhead head feels generous but needs strong flow behind it.
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Rules that apply in Scotland
In Scotland there is no Part P, but a new shower circuit must still be designed, installed and certified to BS 7671. Water fittings, including pumps and backflow protection, are covered by the Scottish Water Byelaws 2014.

