Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Scottish Borders · EH45

Shower installation in Peebles

We cover shower installation in Peebles and the rest of the Scottish Borders. Every job starts with a measured survey at your home and a written price before anything is ordered.

£450–£3,400 inc VAThalf a day to 3 daysFree home survey
Thermostatic shower valve and rainfall head being installed, example for Peebles
Postcode districts
EH45
Nearby
Penicuik, Galashiels and Bonnyrigg
Guide price
£450–£3,400
Typical time on site
half a day to 3 days
Water
Soft across most of the Scottish Borders
Survey
Free, at your home

What does a new shower cost in Peebles?

As a guide, budget £450 to £3,400 including VAT for a new shower in Peebles; your written quote will pin it down. Prices in Scotland run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.

Shower swap

£450–£950
  • Like-for-like mixer or electric shower

New shower with enclosure

£1,450–£3,400
  • Tiling to the enclosure

Guide prices for Peebles including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Peebles

We cover every part of Peebles, including EH45, and nearby Penicuik (12.5 miles) and Galashiels (15.1 miles).

Being a smaller town does not change how we work in Peebles: free survey, written quote, one team. If your Peebles bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two. If you are replacing a failed electric shower in Peebles, we check whether the existing cable and circuit suit the new unit.

Supplies across most of the Scottish Borders are soft. If that holds for your street in Peebles, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • A check of your hot-water system, water pressure and flow rate
  • Electrical connection by a qualified electrician, tested and certified
  • New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
  • Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area

Decisions to make first

Head and handset

A handset on a riser rail is versatile and easy for rinsing; a fixed overhead head feels generous but needs strong flow behind it.

Power shower

A mixer with a built-in pump, for tank-fed systems only. It lifts a weak gravity shower but must never be connected to the mains.

Rules that apply in Scotland

In Scotland there is no Part P, but a new shower circuit must still be designed, installed and certified to BS 7671. Water fittings, including pumps and backflow protection, are covered by the Scottish Water Byelaws 2014.

More about shower installation

Shower installation in Peebles: questions

How much should I budget for a new shower in Peebles?

A new shower in Peebles usually costs £450–£3,400 including VAT. Expect the lower end for a like-for-like job with standard products, and the upper end if things move or you choose premium finishes. Your quote is itemised and fixed in writing once agreed.

Is the water hard in Peebles?

Supplies across most of the Scottish Borders are soft. If that holds for your street in Peebles, limescale on shower glass and heads builds up slowly and a squeegee after use is usually enough. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Will a new shower in Peebles need a building warrant?

Usually not for a straight refit. Building warrants are issued by the local council's building standards service, and forming a new bathroom, changing drainage or structural work can need one. We tell you at the survey and handle the application if one is needed.

How long does a new shower take?

Allow half a day to 3 days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Peebles.

Can I fit a shower pump with a combi boiler?

No. A combi boiler takes its water from the mains, and connecting a pump directly to the mains supply is not allowed under the water fittings regulations. Shower pumps are only for gravity systems with a cold tank. If a combi shower is weak, the cause is usually the incoming flow, the boiler output or the head, not something a pump can fix.

Shower installation in Peebles

Book a free home survey in Peebles. You get a measured layout and an itemised written price before anything is ordered.