- Postcode districts
- B25, B26, B27
- Nearby
- Shirley, Solihull and Washwood Heath
- Guide price
- £450–£3,400
- Typical time on site
- half a day to 3 days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a new shower cost in Acocks Green?
Guide price in Acocks Green: £450–£3,400 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Acocks Green including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Acocks Green
We work right across Acocks Green — B25, B26 and B27 — and in neighbouring Shirley and Solihull.
In Acocks Green, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are replacing a failed electric shower in Acocks Green, we check whether the existing cable and circuit suit the new unit. We test pressure and flow at Acocks Green surveys before recommending a shower, so you know how it will perform before you buy.
Hardness differs from one part of the West Midlands to the next. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Acocks Green. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Tiling or re-tiling around the shower, with tanking behind new tiles in the wet area
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
- A check of your hot-water system, water pressure and flow rate
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
Decisions to make first
Thermostatic mixer
Blends hot and cold from your system and holds the temperature steady when someone runs a tap. The usual choice with a combi or an unvented cylinder.
Digital shower
A wall panel sets the exact temperature and flow, while the mixing valve sits out of sight. It needs a power supply and suits a clean, concealed look.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

