- Postcode districts
- RM8, RM9, RM10
- Nearby
- Becontree, Romford and Hornchurch
- Guide price
- £5,600–£11,250
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a shower room cost in Dagenham?
In Dagenham, a shower room typically costs £5,600–£11,250 including VAT, based on London prices. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Essential
- Tray, enclosure and mixer shower
Signature
- Fitted vanity and concealed cistern
Bespoke
- Underfloor heating, mirror cabinet
Guide prices for Dagenham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Dagenham
As well as Dagenham itself (RM8, RM9 and RM10), we survey in Becontree, Romford and Hornchurch.
In Dagenham, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your second bathroom in Dagenham is too narrow for a bath, a long walk-in tray can often fit along the same wall. If you are converting a bathroom in Dagenham into a shower room, we price a tray and a tiled level floor side by side.
Water across much of Greater London is very hard. If your supply in Dagenham is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Removal of the old bath and suite, waste removal, testing and handover
- A basin and WC to suit the space, freestanding or set into a fitted furniture run
- A thermostatic shower valve, exposed or concealed, with a fixed head, a handset or both
- Tanking to the shower area, then wall and floor tiling
Decisions to make first
Valve and heads
A bar valve is simple and easy to service. A concealed valve with a ceiling head looks cleaner but needs good flow to perform.
Storage
With no bath, there is often space for a full-width vanity unit or a tall cupboard for towels.
Rules that apply in England
In England, any change to the wiring in the shower room, or a new circuit for an electric shower, is notifiable under Part P. If you are replacing the fan, keep it at least as effective as the old one; Approved Document F gives 15 litres per second intermittent for a bathroom.

