- Postcode districts
- B64, DY1, DY2, DY3, DY5, DY6 + 2 more
- Nearby
- Tipton, West Bromwich and Wednesbury
- Guide price
- £4,400–£8,800
- Typical time on site
- 4–8 working days
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a shower room cost in Dudley?
Guide price in Dudley: £4,400–£8,800 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Essential
- Tiling to the shower area
Signature
- Large walk-in tray and frameless screen
Bespoke
- Concealed thermostatic or digital shower
Guide prices for Dudley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Dudley
As well as Dudley itself (B64, DY1, DY2 and 5 more postcode districts), we survey in Tipton, West Bromwich and Wednesbury.
Dudley has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. If nobody in your Dudley home has used the bath in a while, a shower room puts that space to better use. Where a Dudley shower room doubles as the guest bathroom, we plan storage so it stays clear of clutter.
Hardness differs from one part of the West Midlands to the next. A quick wipe of the glass and an easy-clean coating are worth having on a new shower in Dudley. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A thermostatic shower valve, exposed or concealed, with a fixed head, a handset or both
- A basin and WC to suit the space, freestanding or set into a fitted furniture run
- Tanking to the shower area, then wall and floor tiling
- Removal of the old bath and suite, waste removal, testing and handover
Decisions to make first
Valve and heads
A bar valve is simple and easy to service. A concealed valve with a ceiling head looks cleaner but needs good flow to perform.
Drain
A centre waste in a tray is the norm. A linear drain along one wall lets a tiled floor fall one way, so large tiles can run through.
Rules that apply in England
In England, any change to the wiring in the shower room, or a new circuit for an electric shower, is notifiable under Part P. If you are replacing the fan, keep it at least as effective as the old one; Approved Document F gives 15 litres per second intermittent for a bathroom.

