- Postcode districts
- PL25
- Nearby
- Bodmin, Truro and Newquay
- Guide price
- £600–£1,850
- Typical time on site
- 1–2 working days
- Water
- Soft across most of Cornwall
- Survey
- Free, at your home
What does a bathroom strip-out cost in St Austell?
Guide price in St Austell: £600–£1,850 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Pipework capped safely
Strip-out and prep
- Ready for fitting
Back to brick
- Plaster and tiles removed
Guide prices for St Austell including VAT. Your itemised written quote after the free survey is the price that counts.
Working in St Austell
We work right across St Austell — PL25 — and in neighbouring Bodmin and Truro.
Being a smaller town does not change how we work in St Austell: free survey, written quote, one team. For St Austell homes built before 2000, we ask about textured ceilings and old floor tiles before quoting a strip-out. Strip-outs in St Austell include the waste going away with a licensed carrier, so nothing is left on the drive or the pavement.
Supplies across most of Cornwall are soft. Soft water is kind to grout, so mid-tone and darker grouts stay looking fresh. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Waste loaded and taken away by a licensed waste carrier
- Wall and floor tiles taken off with as little damage as possible to sound plaster
- Removal of the bath or shower tray, enclosure, basin, WC, furniture and accessories
- A note of what was found: floor and wall condition, pipe runs and any damaged timber
Decisions to make first
Salvage
If you want to keep a cast-iron bath, a radiator or a piece of furniture, say so before we start, so it comes out whole rather than in pieces.
Timing
Strip out just before the fit rather than weeks ahead, so the house is without a bathroom for as short a time as possible.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

