- Postcode districts
- GL1, GL2, GL4
- Nearby
- Cheltenham, Stroud and Tewkesbury
- Guide price
- £600–£1,850
- Typical time on site
- 1–2 working days
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does a bathroom strip-out cost in Gloucester?
As a guide, budget £600 to £1,850 including VAT for a bathroom strip-out in Gloucester; your written quote will pin it down. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Suite, tiles and fittings removed
Strip-out and prep
- Floor checked and overlaid
Back to brick
- Room ready for a full renovation
Guide prices for Gloucester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Gloucester
In Gloucester we cover GL1, GL2 and GL4; we also cover Cheltenham, 7.4 miles away, and Stroud.
Gloucester is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. For Gloucester homes built before 2000, we ask about textured ceilings and old floor tiles before quoting a strip-out. We time strip-outs in Gloucester for just before the fit, so you are not left without a bathroom while waiting for products.
Most of Gloucestershire has hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Isolating the water and capping the supply to each fitting with a proper end, then checking for leaks
- Lights, fan, shaver socket and heated rail disconnected and made safe by a qualified electrician where needed
- Removal of the bath or shower tray, enclosure, basin, WC, furniture and accessories
- Wall and floor tiles taken off with as little damage as possible to sound plaster
Decisions to make first
Asbestos testing
In a home built before 2000, a sample test before work starts settles whether a ceiling coating, floor tile or boxing panel needs specialist removal.
Salvage
If you want to keep a cast-iron bath, a radiator or a piece of furniture, say so before we start, so it comes out whole rather than in pieces.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

