- Postcode districts
- RG26
- Nearby
- Basingstoke, Thatcham and Newbury
- Guide price
- £650–£2,000
- Typical time on site
- 1–2 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a bathroom strip-out cost in Tadley?
As a guide, budget £650 to £2,000 including VAT for a bathroom strip-out in Tadley; your written quote will pin it down. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Suite, tiles and fittings removed
Strip-out and prep
- Floor checked and overlaid
Back to brick
- Room ready for a full renovation
Guide prices for Tadley including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tadley
As well as Tadley itself (RG26), we survey in Basingstoke, Thatcham and Newbury.
Being a smaller town does not change how we work in Tadley: free survey, written quote, one team. If your Tadley bathroom is upstairs, the stairs and landing are protected before anything heavy comes down. For Tadley homes built before 2000, we ask about textured ceilings and old floor tiles before quoting a strip-out.
Supplies across most of Hampshire are hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Lights, fan, shaver socket and heated rail disconnected and made safe by a qualified electrician where needed
- The soil pipe sealed against smells once the WC is off
- Dust sheets and floor protection on the route out through the house
- Wall and floor tiles taken off with as little damage as possible to sound plaster
Decisions to make first
Keep or lose the plaster
Tiles often come off leaving plaster that can be tiled again. If the plaster comes away with them, the wall is boarded or re-plastered.
Salvage
If you want to keep a cast-iron bath, a radiator or a piece of furniture, say so before we start, so it comes out whole rather than in pieces.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

