- Postcode districts
- DA3, DA4, DA13
- Nearby
- Hartley, Swanscombe and Gravesend
- Guide price
- £650–£2,000
- Typical time on site
- 1–2 working days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a bathroom strip-out cost in Longfield?
As a guide, budget £650 to £2,000 including VAT for a bathroom strip-out in Longfield; your written quote will pin it down. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Strip-out only
- Waste taken away
Strip-out and prep
- Walls boarded or patched
Back to brick
- Rotten timber found and repaired
Guide prices for Longfield including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Longfield
We cover every part of Longfield, including DA3, DA4 and DA13, and nearby Hartley (0.7 miles) and Swanscombe (3.5 miles).
Longfield gets the same process as anywhere else: a free survey at your home and a written, itemised quote. For Longfield homes built before 2000, we ask about textured ceilings and old floor tiles before quoting a strip-out. Landlords in Longfield can book a strip-out to see the real condition of a damaged bathroom before choosing between a refit and a renovation.
Supplies across most of Kent are very hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Dust sheets and floor protection on the route out through the house
- Lights, fan, shaver socket and heated rail disconnected and made safe by a qualified electrician where needed
- A note of what was found: floor and wall condition, pipe runs and any damaged timber
- Wall and floor tiles taken off with as little damage as possible to sound plaster
Decisions to make first
Salvage
If you want to keep a cast-iron bath, a radiator or a piece of furniture, say so before we start, so it comes out whole rather than in pieces.
The floor
Old vinyl or tiles on a ply overlay can come up with the ply. Tiles bonded to a screed may need grinding back or overlaying instead.
Rules that apply in England
In England, stripping out a bathroom does not need planning permission or building regulations approval in itself. Building regulations come in with what follows, such as new drainage under Part H or new circuits under Part P.

