- Postcode districts
- BS21
- Nearby
- Nailsea, Portishead and Weston-super-Mare
- Guide price
- £350–£1,550
- Typical time on site
- half a day to 1 day
- Water
- Hard across most of Somerset
- Survey
- Free, at your home
What does a new vanity unit cost in Clevedon?
Our guide price for a new vanity unit in Clevedon is £350–£1,550 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit your unit
- Taps and waste connected
Supply and fit
- Removal of the old basin
Double or bespoke
- Double basin or long run
Guide prices for Clevedon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Clevedon
We cover every part of Clevedon, including BS21, and nearby Nailsea (4.3 miles) and Portishead (4.7 miles).
Clevedon gets the same process as anywhere else: a free survey at your home and a written, itemised quote. Landlords in Clevedon can have a worn basin replaced with a vanity unit in half a day to a day. We quote vanity unit work in Clevedon after seeing the wall and pipework, so any re-tiling is on the quote from the start.
Supplies across most of Somerset are hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Patching or re-tiling the wall where the old basin left gaps
- A check that the wall can carry a wall-hung unit, with fixings to suit solid or stud walls
- Fitting the unit level, with the basin sealed to the top and the top sealed to the wall
- A new tap, trap and the correct slotted or unslotted waste for the basin
Decisions to make first
Width
Compact units around 400 mm wide suit cloakrooms; family bathrooms often take 600 to 800 mm for one basin and 1200 mm or more for two.
One basin or two
Two basins help a busy household if the wall is long enough. In a smaller room, one basin with a longer top often works better.
Rules that apply in England
In England, the tap and supply pipework come under the Water Supply (Water Fittings) Regulations 1999. A new waste connection to the soil stack can be Part H work, and adding a light to the unit or above it is notifiable under Part P.

